I was asked to relocate an existing 200 amp panel from one end of a commercial building to a new location 25' away. All of the branch circuits in the old panel were romex. I placed two junction boxes to pick up the branch circuits and rerouted the old romex runs to the boxes and new panel. I put any new circuit in conduit. I am troubled by the fact that other than the conduit I have run, nothing seems right about this particular job. There must be miles of romex and this is an old building. I told the owner that the romex should be torn out and he laughed at me and said it cost him too much to have it put in....I really don't want to be on the hook if this place burns down...any thoughts