I have been asked to wire an existing elevator in an assisted living facility from normal power to emergency power.
It is 480 volt 32 amp 3 phase 25 hp currently on a 100 amp normal power branch circuit, car light disconnect mounted right beside it.
Generator has plenty of capacity and it seems like it would be a simple enough matter to remove the normal power and bring emergency power into existing disconnects and be done with it.
I have not gone as far as filing the permit yet to see if they will require an engineered drawing, but get the feeling I am going to get blindsided by something I don't know. Anybody have experience in this area?
Many thanks.
It is 480 volt 32 amp 3 phase 25 hp currently on a 100 amp normal power branch circuit, car light disconnect mounted right beside it.
Generator has plenty of capacity and it seems like it would be a simple enough matter to remove the normal power and bring emergency power into existing disconnects and be done with it.
I have not gone as far as filing the permit yet to see if they will require an engineered drawing, but get the feeling I am going to get blindsided by something I don't know. Anybody have experience in this area?
Many thanks.