I have 5 stories apartment complex building with three additional stories below grade p1,p2,p3 for parking. The service switchboards are located From their cables go up each floors to meter stacks.
I was told that those cables would need to be run inside a stack enclosed 2 hours rated from p3 all the way to fifth floor. However i do not see this in NEC 2017 anywhere. Is it in their code and sections?
I was told that those cables would need to be run inside a stack enclosed 2 hours rated from p3 all the way to fifth floor. However i do not see this in NEC 2017 anywhere. Is it in their code and sections?