I have seen a similar post involving a single generator and two meters/panelboards. The solution was two separate transfer switches.
I have a similar, customer decided he wants a generator and also wants 5 meters/ separate service panels. Seems my solution is 5 transfer switches? Can there be a logic control that would help avoid this. If so, please supply with vendor contact info. Thank you all.
I have a similar, customer decided he wants a generator and also wants 5 meters/ separate service panels. Seems my solution is 5 transfer switches? Can there be a logic control that would help avoid this. If so, please supply with vendor contact info. Thank you all.