Single story 20k sq ft building with a 600A 480V service. This building is being developed to eventually need more utility power, 4MVA vs the existing 0.5MVA.
The owner wants to get up and running as quickly as possible and begin using the 600A service. When it comes time to expand, requiring more utility service, will it be okay to ask for additional service feeders, rather than increase the size of the existing. We do not want to have to shut down power with active equipment within the building, in order to replace the service.
My gut feeling is that we would be limited to the single service until we got above 2000A.
What are your thoughts.
The owner wants to get up and running as quickly as possible and begin using the 600A service. When it comes time to expand, requiring more utility service, will it be okay to ask for additional service feeders, rather than increase the size of the existing. We do not want to have to shut down power with active equipment within the building, in order to replace the service.
My gut feeling is that we would be limited to the single service until we got above 2000A.
What are your thoughts.