I have an engineer proposing to install a shunt trip to turn off all power to a multiple-occupancy commercial building. Power for the shunt will be from the house panel. The push-button will be in a lockbox with a fire key. My problem is that for some ethereal reason, it just doesn't seem right... Am I way off base ? Can someone give me hint from the code?
Ken
Ken