I've always went out of my way to design any 120 Volt circuit that is going through a MCC bucket to first be routed through a CB aux or generate from a CPT in the bucket. I've thought this was a code requirement as much as it was in my opinion a good design practice. Is there a Code reference for this situation? Thanks
Current Situation:
Ckt1 = Control Circuit for the bucket (after plant E-stop)
Ckt2 = Auxiliary LED lighting circuit on piece of equipment.