I've always went out of my way to design any 120 Volt circuit that is going through a MCC bucket to first be routed through a CB aux or generate from a CPT in the bucket.  I've thought this was a code requirement as much as it was in my opinion a good design practice.  Is there a Code reference for this situation?  Thanks
Current Situation:
Ckt1 = Control Circuit for the bucket (after plant E-stop)
Ckt2 = Auxiliary LED lighting circuit on piece of equipment.
	
		
			
		
		
	
				
			Current Situation:
Ckt1 = Control Circuit for the bucket (after plant E-stop)
Ckt2 = Auxiliary LED lighting circuit on piece of equipment.
				