Darren Stutzke
Member
- Location
- Spokane Washington
- Occupation
- electrician
NEC 230-67.D " Where service equipment is replaced, all of the requirements of this section shall apply." Question, would a SPD be required when installing an automatic generator transfer switch for whole house on an existing system? The transfer switch would be installed between the existing meter and the existing panel. The service equipment was not replaced but the service was altered.