NEC 702.12 (A) requires a separate disconnect for a generator if the generator is not within sight. NEC 445.18(B) allows the prime mover shutdown to act as the generator shutdown. Can the emergency shutdown of the prime mover serve as the separate disconnect for a generator that is not within sight?