Hello,
My senior engineer gave me the task to look at the nec 230 and address the following situation.
We have a fire pump room, and the fire pump has its own service via 45KA step up transformer. I need to move the 45KVA to the outside of the fire pump room and follow the direction of the NEC 230 to address the new modifications.
My question is: where to look exactly in article 230 and what to look for when I want my design to be code compliant.
Sorry but I'm confused and don't know what to do.
Thank you
My senior engineer gave me the task to look at the nec 230 and address the following situation.
We have a fire pump room, and the fire pump has its own service via 45KA step up transformer. I need to move the 45KVA to the outside of the fire pump room and follow the direction of the NEC 230 to address the new modifications.
My question is: where to look exactly in article 230 and what to look for when I want my design to be code compliant.
Sorry but I'm confused and don't know what to do.
Thank you