I have an enclosure with a disconnect inside with distribution lugs and I distributed the "tap conductors" to their overcurrent devices that are inside of the enclosure too, does this connection counts as the "point where the conductors receive their supply"?
what i mean is if I use wires to connect the tap overcurrent devices, do I need to follow the 3FT rule?