c.cole01
New User
- Location
- riverside, ca
- Occupation
- PV
I have a RV site that has 600 - 50a 120v sites on a 600amp service.
They want me you run load calcs for the site and I don't know how this amount of sites is possible. I calc that it should be 30 sites per 600a service per NEC 551.73(a)
They want me you run load calcs for the site and I don't know how this amount of sites is possible. I calc that it should be 30 sites per 600a service per NEC 551.73(a)