I am wondering if there are any NEC codes as for either how deep the rigid EMT must be before it a stub-up is made, or if there is any NEC code as to how high the stub-up must be and if so from where. The few codes I have come across about such things are NEC 390 which discusses how deep the raceway must be if it is under ground, but not about the stub-up.