rbwsparky
Senior Member
- Location
- Sewickley,PA
I have 2 apartments in a single building. There is a 1/0 SE Aluminum going to a 2 meter socket with 2 fuse panels rated at 100A each(no means of disconnect, besides pulling meter). I would like to add 2 100A Murray panels with 100A Main breakers and 24 spaces and update grounds. My combined calculated load load is about 72 amps. Am I missing anything, or does this sound like an acceptable installation?