I have another contractor not following the code. Actually, they do not know the code. I am currently working in a high rise codo project in Las Vegas. The AV company that is working on the job are not following the rules. They are installing Flex on bare floor. These floors still need to have concrete installed The flex will be incased in the concrete. I found that code. I need to find in the book where it states that plastic boxes, plastic cut in rings are not permitted. The company insist that they are doing the job right. They have always pasted inspections. I know this for a fact because I did not pass an inspection because of ths company. Can someone help me find the cde for the boxes.
Mark
Mark