Now Don, read what Dennis said, he said "held up" not "turned down".

Just because the t-bar guy passes inspection doesn't mean he can start setting ceiling tiles. He has to wait until everyone who is working above the ceiling passes inspection.
 
cowboyjwc said:
read what Dennis said, he said "held up" not "turned down".

As long as you sign the 'OK' box on the building card for my permitted work feel free to hold up the job as long as you want. :grin:
 
iwire said:
As long as you sign the 'OK' box on the building card for my permitted work feel free to hold up the job as long as you want. :grin:


JUST NOT THE PAYMENT !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
 
acrwc10 said:
JUST NOT THE PAYMENT !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!

Yup...my payments are structered towards my work passing inspections ~ NOT anyone else's.
 
Dennis Alwon said:
Around here they do the same. If the heating contractor wires his thermostat wire to an outdoor unit without sleeving it in carflex or something to protect it, then the electrical final will be held up because it falls under the electrical code not HVAC.

Do you have to protect it?

Around here it is common practice to Tie-wrap it to the Carflex going to the A/C Unit.

Tom:confused:
 