I am to begin a project I have not had to do before. I have changed services for quite some time but have never had to install a 4 gang meter base with 4 disconnects. This is going to be installed outside on the rear of an apartment building. Meter bank is bad and needs to be replaced per Dominion Power. The power feed will come in the center of the meter base. Thanks for the advice.