Hello there, I am wiring up a 240VAC 2 wire 1 phase recepctle. I have 240VAC 3phase subpanel where I can install an additional circuit breaker to get this job done. I would like to just make sure that I am doing it correctly. On this subpanel there are 3Hot and 1 ground come in from the main panel. Between the phases I am getting 240VAC and from ground to any one of the leg it reads 240VAC also. Sould not I be reading 120VAC instead? Any help.
Thanks.