Primarycontractinginc.
Member
- Location
- Massachusetts
- Occupation
- Master Electrician
Electrical Inspector is telling me I must use 350KCMIL for Parallel feeders to the 400amp meter feeding 2 -200amp services (2 family House) for the over head service? I have pulled 300's Aluminum in Parallel ?
