rawlands
Member
- Location
- andover, mn
I am installing a new 800a meter bank for a new cell tower site.  There will be 4 200a meter/disconnects and no main.  120/240v 1phase.  We will be using pvc under ground.  How does 2-3" with 2 sets each of 300 aluminum sound.  Am I safe in figuring I will not get 90c lugs in the service gear?  Also,  as far as the grounding electrode goes,  Will a ground rod, and the grounding loop around the tower (spec to be 5ohms or less and #2 tinned copper) be sufficiant?
	
		
			
		
		
	
				
			 
				
 
 
		