Skullmesaranch
New User
- Location
- Cave Creek
- Occupation
- Electrical Engineer
This is just the first phase of my new construction house electrical system. It went smoothly and the licensed electrician seemed to be fine. A few months later he started contacting me too much and acting erratic. He claimed he couldn't finish the job so I asked him to show me how he left things. As we opened the panel he realized that he hadn't labeled any of the wires.
This guy is going through a difficult situation and I can't have him working on my system. What's the best way to move forward on mapping the circuits? I had an electrician tell me today that he would just finish the job (install the switches, lights, recep, etc) and then energize each circuit with a generator to map the system. This doesn't seem right to me. Is there a passive way to do this (w/o a generator) like check continuity? What is the best way to handle this situation?
This guy is going through a difficult situation and I can't have him working on my system. What's the best way to move forward on mapping the circuits? I had an electrician tell me today that he would just finish the job (install the switches, lights, recep, etc) and then energize each circuit with a generator to map the system. This doesn't seem right to me. Is there a passive way to do this (w/o a generator) like check continuity? What is the best way to handle this situation?
