I'm working on a project that has a new service being fed to an existing building. The intent is for it to stub up inside the building. I want to provide the contractor with as much information as possible but I am not very familiar with the proper installation method. We don't have a standard detail for this either. Is this typically done by going through the foundation wall or does it typically go below the footings?
Any insight is appreciated!
Any insight is appreciated!