Britt Crist
Member
I am well aware that in certain areas of the country the current practice of bringing all nm cables into the back of a NEMA 3R service cabinet through one 2" nipple is in violation of the code (312.5(C). I was also told that a cabinet is made by most manufacturers that can be partially recessed into the brick or whatever siding is on the exterior of the home allowing access to the top of panel for cable entry and attachment. What other code compliant methods are there? It would seem any entry into the back of an exterior panel would violate the bending radius of the nm cable as well whether it was secured or not.