I’ve got a basement floor joist space I need to run quite a few NM cables through.
There is a drop ceiling and many of the cavities have duct work and panned of sections for return air.
Drilling the joists will be extremely difficult at best.
Was thinking of screwing in bridle rings every 32” to the bottom of the joists and pulling cable through them.
Pulling cables and stapling to underside of joists is an option but it looks like it could be a real birds nest navigating tie wires and wiring to lay in troughers.
Anybody see a code issue I’d be overlooking by doing this?
Thanks
There is a drop ceiling and many of the cavities have duct work and panned of sections for return air.
Drilling the joists will be extremely difficult at best.
Was thinking of screwing in bridle rings every 32” to the bottom of the joists and pulling cable through them.
Pulling cables and stapling to underside of joists is an option but it looks like it could be a real birds nest navigating tie wires and wiring to lay in troughers.
Anybody see a code issue I’d be overlooking by doing this?
Thanks