I recently was turned down on an inspection because we had entered the back wall on a meter/main combo box (200 A) through snap in bushings .The cables were stapled within 12 inches of the bushings, but the inspector wants us to install the two-screw type cable connector. Can anyone lend me a code reference that might help us from re-terminating the whole panel back over again? Panel looks "tight"too!