Brett Glass
Member
I was in a building today in which I observed NM that had been run horizontally through the same holes in floor joists as a gavanized cold water pipe. While the holes were big enough to hold both, I told the owner that this was not good workmanship and might be a Code violation. But now that I've scanned my NEC I can't actually find anything that prohibits it. Is there a clearance requirement or a requirement for separate penetrations, and if so where is it?