Church holds over 100 people perhaps 150. Structure is mostly wood/lath and plaster inside, outside is wood siding, footing is stone. Whats left of the knob and tube is inactive. Thanks for all the input!

So it probably won't comply with IBC. Existing probably gets grandfathered, renovations/additions likely need to comply with IBC.

Rewiring or additions to wiring still need to comply with NEC, or where it is at CEC.
 
Church holds over 100 people perhaps 150. Structure is mostly wood/lath and plaster inside, outside is wood siding, footing is stone. Whats left of the knob and tube is inactive. Thanks for all the input!

How many it holds is irrelevant What is the capacity per the fire Marshall.
 
Since the NEC is the minimum requirements i always concerted the safety of the people that are using the equipment I am powering.