hillbilly1
Senior Member
- Location
- North Georgia mountains
- Occupation
- Owner/electrical contractor
We have a customer that has a lot of these at their different locations, non-fused 2000 amp 480 volt 3 pole transferswitches fed straight from the poco transformer, then to the service disconnect(s). Apparently it legal, as they have a lot of facilities like that, just trying to figure out where in code it is allowed? Is it because it’s not the service disconnect? Quoting the changeout of one, and don’t want to be tagged by the inspector without documentation saying it’s allowed.