Good morning,
Working for a friend, they built a pole barn on some hunting property and have a meter socket 300 foot away at the road. Building inspector not the electrical inspector stated to run two 4/0 USE-2 aluminum wires and one ground from the socket to the barn and it will pass. the panel in the barn is a 200amp panel. I stated they can cost effectively use 2/0 USE-2 Aluminum but would need 3-2/0 cables and a ground (2-hots 1-neutral and ground). Who's right and if I'm wrong please tell me why. Keep in mind the building inspector is making this statement not the electrical inspector.
LHarrington
Working for a friend, they built a pole barn on some hunting property and have a meter socket 300 foot away at the road. Building inspector not the electrical inspector stated to run two 4/0 USE-2 aluminum wires and one ground from the socket to the barn and it will pass. the panel in the barn is a 200amp panel. I stated they can cost effectively use 2/0 USE-2 Aluminum but would need 3-2/0 cables and a ground (2-hots 1-neutral and ground). Who's right and if I'm wrong please tell me why. Keep in mind the building inspector is making this statement not the electrical inspector.
LHarrington