Installing a critical load sub-panel, fed from manual gen/grid transfer switch. Transfer switch fed via either, 30A / 240V breaker from main panel, or, 30A / 240V generator. Generator has its own OCPD. Main panel breaker is obviously also an OCPD.
Question:
Does the critical load panel, also need it's own OCPD or is it acceptable to rely on the "upstream" main panel breaker and the generator breaker, for OCPD.
Question:
Does the critical load panel, also need it's own OCPD or is it acceptable to rely on the "upstream" main panel breaker and the generator breaker, for OCPD.