I would of given some of the money back on that one.
For what I bid the job for, yes. But installing the extra boxes & 14/3, no. it was a gamble on my part to do that, and it paid off, and paid off very well. In essence, I did a remodel job with the advantage of having the job open during rough-in.
The same scenario plays out every day when someone decides to finish their basement. They usually want a bathroom down there. Did anyone take the time to rough in the plumbing for it before the slab was poured?
You're kidding?!?Just got my news letter from MH.
Congatulations to $Electricmanscott !! This was ranked the #1 thread for 2008.
Just got my news letter from MH.
Congatulations to $Electricmanscott !! This was ranked the #1 thread for 2008.
Makes perfect sense to me. How interesting is a "Today I wired a house completely to code with no issues with the homeowner or anybody" thread? People would be exchanging recipes by the sixth post.How ironic, a thread about violating the code is the top NEC forum thread for the month.:grin: