72.5kv
Senior Member
A small store had a single phase 50KVA 120/240 pole mount tranformer feeding its service. The city installed an irrigation pump that is 240 3 phase. To supply the pump, the utility changed the single phase service to open delta. It is now a 75KVA with a 25KVA on the open side. How is the total output of the bank computed?
	
		
			
		
		
	
				
			
			