scubad3932
Member
Not 100% sure on Health care installs but can an OR light be installed using Hospital grade MC.
The OR is going from a single head light to a duel head light and I need to add a new switch.. Wasn't sure from what I can read in the code book it says a metal raceway or a metal sheath that can be counted as a ground.
Since its an OR that is up and running adding pipe down a wall to a new switch is impossible with out having to cut the wall open.
The OR is going from a single head light to a duel head light and I need to add a new switch.. Wasn't sure from what I can read in the code book it says a metal raceway or a metal sheath that can be counted as a ground.
Since its an OR that is up and running adding pipe down a wall to a new switch is impossible with out having to cut the wall open.