Hello every one,
I'm working on a project where the owner wants us to install an outdoor switchboard (or switchgear) to serve some existing loads inside the building. Can we install overhead conduits (top entry) to a NEMA 3R enclosure? I just thought we are not allowed to drill through the enclosure for conduits entry. thanks,
I'm working on a project where the owner wants us to install an outdoor switchboard (or switchgear) to serve some existing loads inside the building. Can we install overhead conduits (top entry) to a NEMA 3R enclosure? I just thought we are not allowed to drill through the enclosure for conduits entry. thanks,