Sorry if this is a repeat.
I am having trouble trying to understand what requirements need to be met in order to eliminate the need of an outside main disconnect switch. I have seen several projects where the secondary from the POCO transformer comes straight to a C.T. Cabinet or meter and then to the MDP inside of the structure. Also, the MDP is not always located in a room that is near an exit. I've also seen several jobs pass inspection this way. Another thing, does a pad mount transformer differ from a pole mount transformer where this is concerned? I don't see why it would but this question has come up and would be interesting to know why if so.
Thanks!
I am having trouble trying to understand what requirements need to be met in order to eliminate the need of an outside main disconnect switch. I have seen several projects where the secondary from the POCO transformer comes straight to a C.T. Cabinet or meter and then to the MDP inside of the structure. Also, the MDP is not always located in a room that is near an exit. I've also seen several jobs pass inspection this way. Another thing, does a pad mount transformer differ from a pole mount transformer where this is concerned? I don't see why it would but this question has come up and would be interesting to know why if so.
Thanks!