A 3 phase 4/0 feeder starts at a indoor switchboard with a 225a breaker and runs in EMT overhead 250' through a warehouse trapeze hung. It then exits the warehouse where it runs 100' underground to a Christy box where it is terminated to (4)70a 1 phase #3 feeders. It then goes to (4) buildings each with a 100 amp, 1 phase panelboard with 70a main breaker. Is this allowed under the NEC 240.21(B)(5)