It's a 36kv 20MW system, and we have previous experiences that when the ground was disconnected on the other end, the fault disappear. The problem now is the specs of the surge voltage limiters to be installed. That is why we are requesting a shield voltage study.
Sent from my SM-N900 using Tapatalk
Sent from my SM-N900 using Tapatalk