jerryatric
Member
- Location
- florida
Booth manufacturer supplied fixtures to be installed as in 516.4(c)(3). The back of the fixtures ( in the booth ceiling) will be in the supply plenum. As air will be recirculated during the curing process the supply plenum will be class I div. 2 as I understand it : 516.3(D)(4)(2)(a). Fixtures are rated class I div. 2. Do I need a seal at each individual fixture or just at the boundaries ?Thanks for any help.