I have been trying to revamp and develop an automated type panel schedule for three phase panels.
In doing so I'm trying to think outside the box so to speak, and question exactly what is the panel schedule's intent? What information is really important, i.e. to the designer, installer, owner, building department.
There are so many different one's out there that I have seen over the years, but based on a wide degree of exposure (this forum) what info is really needed, and why is it needed?
Let this be a pandora's box, there are no right or wrong opinions, I want to here all sides.:thumbsup:
In doing so I'm trying to think outside the box so to speak, and question exactly what is the panel schedule's intent? What information is really important, i.e. to the designer, installer, owner, building department.
There are so many different one's out there that I have seen over the years, but based on a wide degree of exposure (this forum) what info is really needed, and why is it needed?
Let this be a pandora's box, there are no right or wrong opinions, I want to here all sides.:thumbsup: