DLP1911
Member
- Location
 - Chesterton,IN USA
 
I need to move a panelboard around the corner from its existing location, because it is behind the heating ductwork with only 12" clearance, can I strip the guts from the existing panelboard and use it as a JBOX so i dont have to rewire all the home runs? I read 312.8 about this and it seems this section is discussing if it was still switchgear or an existing panelboard. Any thoughts or experience?
	
		
			
		
		
	
				
			
				