hhsting
Senior Member
- Location
- Glen bunie, md, us
- Occupation
- Junior plan reviewer
I have panelboard main service disconnect disconnect with main breaker.
We have finally moved and in transition to NEC 2017.
I am looking at NEC 2017 section 240.24 and it modifies that section to switches containing fuses and circuit breaker. To me this is not a panelboard
Does NEC 2017 have panelboard mounting height requirement or not?
We have finally moved and in transition to NEC 2017.
I am looking at NEC 2017 section 240.24 and it modifies that section to switches containing fuses and circuit breaker. To me this is not a panelboard
Does NEC 2017 have panelboard mounting height requirement or not?