hhsting
Senior Member
- Location
- Glen bunie, md, us
- Occupation
- Junior plan reviewer
I have panelboard main service disconnect disconnect with main breaker.
We have finally moved and in transition to NEC 2017
.
I am looking at NEC 2017 section 240.24 and it modifies that section to switches containing fuses and circuit breaker. To me this is not a panelboard
Does NEC 2017 have panelboard mounting height requirement or not?
We have finally moved and in transition to NEC 2017
.I am looking at NEC 2017 section 240.24 and it modifies that section to switches containing fuses and circuit breaker. To me this is not a panelboard
Does NEC 2017 have panelboard mounting height requirement or not?