paulgarett
Member
- Location
- San Rafael, CA
I installed a temporary back-up generator and installed the emergency conductors to the Automatic Transfer Switch. It was a 3 Phase, 277/480 Volt system, a 600 kW Generator, with a 1000 Amp Circuit Breaker. Three of the conductors I used for each of the 3 phases were 444.4 MCM RHH outdoor rated, "freight-train" cable. I only had 4/0 cable for the neutral, so I installed two 4/0 cables in parallel for the neutral conductor. My question is, do all the phases have to be in parallel or single since I used parallel conductors for the neutral and single conductors for the 3 phases?