A/A Fuel GTX
Senior Member
- Location
- WI & AZ
- Occupation
- Electrician
I'm not sure what you mean, "terminate the GEC". Are you saying the "other system" bonding conductors that land under the #10-32 grounding and bonding screws of the Byer In Line gizmo? Or do you actually mean you want to bond an enclosure with a GEC landed under a Byer In Line terminal screw and the Byer In Line only connected to the enclosure by the 1/2" locknut?
What I'm saying is it would be nice to be able to make the GEC connection to a service via the GEC being terminated under the large in line set screw in the Byer and using the locknut to make the connection to the grounded conductor via the meter base enclosure. I doubt it would be acceptable but is a screw in a neutral bar really any better connection than a tight lock nut?