JimmysLimeade
EE Student & PV Design
- Location
- Utah
- Occupation
- PV Design
Hi, Im not too sure whether to post this in the PV forum or NEC forum, but my general question is about the service panel without PV.
I am working on a PV design, and our client sent photos of this panel. To me, it feels wrong for the 150A breaker and 200A panel to be tapped together like this, but I can't put my finger on why it feels wrong. Is this installation okay? If not, is there a code callout I can read to understand why?
The reason I didnt know what forum to post this in is because my client wants to do a supply side tap either above or below the existing tap (idk which one they want). Again, a supply side tap feels off here but I cant figure out why it feels weird.
I'd appreciate some help or clarification on the first question, and I can ask my second question on the PV forum if needed.
Thanks in advance.



I am working on a PV design, and our client sent photos of this panel. To me, it feels wrong for the 150A breaker and 200A panel to be tapped together like this, but I can't put my finger on why it feels wrong. Is this installation okay? If not, is there a code callout I can read to understand why?
The reason I didnt know what forum to post this in is because my client wants to do a supply side tap either above or below the existing tap (idk which one they want). Again, a supply side tap feels off here but I cant figure out why it feels weird.
I'd appreciate some help or clarification on the first question, and I can ask my second question on the PV forum if needed.
Thanks in advance.


