I am interested in getting a better understanding of when a PE stamp is required on a set of drawings.
Is this requirement enforced by the local authority, the state or some sort of a national electrical enforcement?
It's my understanding that a dwelling unit (single family) does not need a PE stamp for a permit. Do some special occupancies require a stamp while others don't (schools vs. health care)?
Is the requirement triggered by the size of the project or the type of project?
How can I get information on these requirements.
Thanks