I know that you use to be able to run all of a phase into a single pipe if the entire run was PVC with no metal but I don't if the '14 code changed anything with it. I can't find the code article. Here's what I want to do.
I would like to run to my transformer from the service with 4 - 6" pipes (PVC). A pipe for each phase and neutrals. Vs running 10 - 4" pipes. There is question #1.
My second question is. Do I need to derate these? I plan on running 10 - 600 Cu per phase for a 4000 amp service.
Thanks
I would like to run to my transformer from the service with 4 - 6" pipes (PVC). A pipe for each phase and neutrals. Vs running 10 - 4" pipes. There is question #1.
My second question is. Do I need to derate these? I plan on running 10 - 600 Cu per phase for a 4000 amp service.