I am working on a project where i am installing a group of photovoltaic cells that feed DC to an inverter. The AC from the inverter goes through a meter and then backfeeds a branch panel through a breaker. The way I understand it is that if there is a load on the braches that are served by this panel that it is less than or equal to the PV systems contribution, the service that feeds the panel (not the PV system) will not see any of this load and the service meter will not see those kW/h's. Am I thinking about this correctly? How is this achieved with no controls?