jjhoward
Senior Member
- Location
- Northern NJ
- Occupation
- Owner TJ Electric
Re: Picking up an abandoned job
Thank you all for the input. I love this forum. I pushed up my price to the GC since he wouldn't have T&M. I allowed 2 hrs/room to prep them for pulling wire (removing drywall and drilling). Then I tallied up the cost for each opening and added $s for "special" items - 6/3 runs for sub panels, updates at the service panels in the basement + some adders for materials + adders for "administration" (Change of contractor etc)
I will track how we actually perform vs. my allowances and share our joy or pain with you.
Thank you all for the input. I love this forum. I pushed up my price to the GC since he wouldn't have T&M. I allowed 2 hrs/room to prep them for pulling wire (removing drywall and drilling). Then I tallied up the cost for each opening and added $s for "special" items - 6/3 runs for sub panels, updates at the service panels in the basement + some adders for materials + adders for "administration" (Change of contractor etc)
I will track how we actually perform vs. my allowances and share our joy or pain with you.